Ferries on the Barra Lagoons: How the Water Transport Will Work and When It Starts
Barra's lagoons (Tijuca, Jacarepaguá, Marapendi and Camorim) cut across the area and separate many condos from the main roads. The idea of using them for transport is old, and in 2025 it became a contract. If it works, it could shorten trips and take lagoon-side residents straight to the metro.
Sources: Rio City Hall, via Boletim RJ (Sep. 2025); Diário do Rio (Dec. 2025).
How it will work
- Lines and terminals: 8 lines and 5 main bases (Jardim Oceânico, Península, Olympic Park, Rio 2 and Recreio), with extra terminals at Rio das Pedras, Gardênia and BarraShopping
- Integration: with the metro at Jardim Oceânico, and with the Jaé card and Bilhete Único Carioca
- Fare: equivalent to other municipal transport
- Boats: smaller than the Guanabara Bay ferries, with electric or solar propulsion planned
- Travel time: the BarraShopping–Rio das Pedras trip was estimated at about 20 minutes
Timeline
- Oct. 2023First tender, with 16 lines planned; the bidding did not go ahead
- Sep. 2025Contract signed: R$ 101 million, 25-year concession, 8 lines
- Dec. 2025First line (Marapendi–Jardim Oceânico) scheduled for late 2026
- May 2026Concessionaire reports R$ 300 million in extra costs, about R$ 220 million of it for dredging
- 2028Contract deadline for all 8 lines and 5 terminals
The dredging deadlock
In May 2026, the consortium presented a study showing that the shallow canals prevent navigation in several stretches. The extra bill comes to about R$ 300 million: R$ 220 million for dredging and the rest to raise bridges on Avenida Ayrton Senna, expropriations and rerouting bike lanes. The city's concessions agency is reviewing the report. The trial operation planned for August 2026 may be delayed.
The ferries could be a real advantage for lagoon-side condos that now depend on cars. But with the dredging deadlock, the project is still a promise. When investing, treat the ferries as possible future upside, never as the main reason to buy.
➡️ Oceà Jardim Oceânico, next to the metro and the future terminal
➡️ Feel Pontal Oceânico (Recreio)
Developments near the future terminals
➡️ Answer 3 questions and see the options for your profile
In a conversation of about 20 minutes we can look at:
- Which parts of Barra benefit from the ferries
- What transport already exists near each development
- Options within your budget
Continue in this guide
Frequently asked questions
When will the Barra ferries start running?
The first line, linking the Marapendi Canal to Jardim Oceânico metro station, was expected to start in late 2026, with the others by 2028. In May 2026, the concessionaire reported about R$ 300 million in extra costs for dredging and other works, which may delay the timeline.
How much will a ticket cost?
The contract sets a fare equivalent to other municipal transport, with integration into the Jaé card and the Bilhete Único Carioca.
Where will the stations be?
The main planned bases are Jardim Oceânico, Península, Olympic Park, Rio 2 and Recreio dos Bandeirantes, with additional terminals at Rio das Pedras, Gardênia and BarraShopping.